Skip to main content

Reply to "The Allegheny, Conemaugh, and Cumberland -bench work is done (mostly) on to laying track!"

@Ken-Oscale posted:

Have you analyzed the grades connecting the levels?

Yes.  SCARM does all that when elevating the tracks.  Maximum grade on the whole layout is 2.5%.  Mainline is no greater than 1.6% but only in a few spots.  Most of the layout is 1% or less.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×