Skip to main content

Reply to "The G&O Story (O Gauge Outdoors)"

On December 30, 2014 a tree fell on the East end of the G&O.  Although the damage was repaired, the display was never right.  The track was never level after the tree fell no matter what we did to fix it.  Therefore, the G&O crew has decided to take the advantage of the down time caused by Covid-19 to rebuild the entire East end of the display.  The first step is to remove the track.  The next step will be to level the display and then replace the track.  NH Joe

The next two photos were taken in early January, 2015.

DSCN7937DSCN8025

The photos below were taken July 4, 2020.

IMG_0815IMG_0817IMG_0818IMG_0823

Attachments

Images (6)
  • DSCN7937
  • DSCN8025
  • IMG_0815
  • IMG_0817
  • IMG_0818
  • IMG_0823

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×