I sold all my original sensor tracks since the IRV2 was available. I have two IRV2 boxes and six of the sleds. I want to get all this working, but there are still roadblocks.
I'll probably put the joiner at the panel where the six devices are and drive the two or three remaining remote LCS boxes with that power.