Skip to main content

Reply to "UPDATED 1-10-21!!!!!!! THE NEW JADA RAILROAD IS FINALLY GETTING UNDERWAY, TRAINS ARE RUNNING !!!!!!!!!!"

Alex M posted:
Mark Boyce posted:

Alex, Yes I too am going to use a swing up bridge to enter the layout.  Actually two bridges at one location because the tracks will be at different levels.

Hi Mark,

Do you happen to have any photo's of your swing up bridge , if yes can you post them here 

Thanks, Alex

Alex,

I have not built the swing up as only one side of the benchwork has been built.  I have one of the bridges, The Menards 24" single track bridge, that I planned to use before deciding to use it for the swing up.  I still have to figure how I will recess the hinge so it is below track level, and also how to make sure the track won't bind.  I don't want to make them swing down because I will probably bump into the bridge while walking through.  

Mark

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×