Skip to main content

Reply to "UPDATED 1-10-21!!!!!!! THE NEW JADA RAILROAD IS FINALLY GETTING UNDERWAY, TRAINS ARE RUNNING !!!!!!!!!!"

Hello all, 

Thank you for the nice comments, this build will be a very slow process as I'm super busy with repairs and upgrades. So progress updates will be far and few between. The way the layout was designed i won't have to climb on the table to reach anything . This saves a lot of time and saves my knees and lower back. 

Coach Joe , Yes the upper connects to the lowers at 3 O'clock. it was designed so a train can travel on the entire layout. 

Rich, here's a photo of the room layout which i should have posted LOL, the peninsula has been repositioned for much better access. 

Thanks, Alex

6B8A23BB-F2CE-4F71-9189-59E208338E7D

 

Attachments

Images (1)
  • 6B8A23BB-F2CE-4F71-9189-59E208338E7D
Last edited by Alex M

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×