At the risk of speaking out of turn for the 765's mechanical gurus, considering all the work that is done every off-season, the main thing that will be needed in 2019-2020 is just the boiler work. The FWRHS already has a large chunk of funds set aside for the material needed. Considering the new flue sheets installed in about 2005-6 are still very good, we shouldn't have anything like that. Rich Melvin's view that this could be done over the winter should be "right on".
|