Skip to main content

Reply to "the New river trips with 765."

At the risk of speaking out of turn for the 765's mechanical gurus, considering all the work that is done every off-season, the main thing that will be needed in 2019-2020 is just the boiler work.  The FWRHS already has a large chunk of funds set aside for the material needed.  Considering the new flue sheets installed in about 2005-6 are still very good, we shouldn't have anything like that. Rich Melvin's view that this could be done over the winter should be "right on".

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×