Skip to main content

Reply to "The Tangled Webs We Weave..."

Okay... "I feel the need... the need to UPDATE!" (Said with no apologies to that flake Tom Cruise.)

After I experimented, and decided that the finicky nature of the small TOC19 trains would lead to more frustrations than enjoyment, and after giving the thought of 3 rail a very serious look...

I have ended going back to my HO "Kansas City & Gulf" theme. Upon making that decision, the first thing I "assumed" was that I'd pick up my "KC Lines" theme for my layout theme, and model a layout loosely based on Kansas City's West Bottoms area and all would be good. That decided it was "Outta' the way! Move it! Move it! KC in the early-to-mid 1960s here I come!"

NOT so fast there, bud...

Since I essentially have a "clean sheet of paper", so to speak (no lumber has been cut as yet)... then... wonder if I could cram the Ozarks into my available space and return to mountain railroading (that I've loved for a long time)?

The more I kicked around the idea of returning to the KC&G's "Ozark Sub" as a layout theme, it kept sound more attractive. Now, upfront, I'll let you know that IF I wanted to literally fill my out building with LAYOUT, then I wouldn't foresee any issues creating an "Ozark Sub" layout. However, that is NOT what I would be willing to do by a far stretch. No, there are certain things that must be. Those things in mind, I compiled a list of "Givens n' Druthers", to see what I could come up with for a track plan that will be in line with my "Givens n ' Druthers.

The crucial "Givens" are:

* I want open space for my work desk/station. I absolutely DO NOT want to have a small desk under bench work and all the pains in he arse that involves. (Been there, done that. Don't want no more of dat.) Plus, I've learned that (for me) IF my work station is PLEASANT, then I tend to enjoy the work station experience more.

* I want plenty of space BEHIND my work station. I detest scooting back my chair and bumping (usually my head) on the benchwork that's too close BEHIND me. I do NOT want a "cramped feeling" around my work station. In a nutshell, I want my work station area to feel like a small "room" and not something that's crammed into a tiny, tight space that it has no business being crammed into in the first place. (That's basically what my work stations have been in the past.)

* There is ONE window in the available layout space that must be accessible and allowance must be made for it to tilt inward for cleaning/maintenance.

* The HVAC of my lower wall mounted unit (think: like a motel room's HVAC) must be easily accessible for filter/coil cleaning/maintenance AND the airflow cannot be obstructed.

The above pretty much dictates that the BULK of ANY layout I design THAT INTRUDES into the inner portions of the building MUST comply with the above "givens". That pretty much means that all the room intrusive stuff must be to the right of the entryway, for my work station area is on the left.

So, I was essentially looking at having access to: The right front wall (8'), the right side wall (15') the back wall (19') and IN MODERATION, the left side wall (15'). The left front wall is where my work station is located. (All this will become more readily assimilated once you view the track plan.)

My "Druthers":

* Decent staging that can accommodate at least 4-5 trains each way during an operating session.

* An acceptable "crew change" point w/town at the "southern" exit point (where the layout track heads for the stage) of the layout. This would (hopefully) include a couple tracks for any "shorts" that are going to arrive/depart the layout, and (again, hopefully) a very small engine service area. (Think: A sheet metal one  unit engine house IF space is available, or at the least a sand/diesel/tie up track.)

* Acceptable curve radii for the visible track.

* Tighter track radius on the hidden/unseen track if needed.

* Acceptable mainline run length.

* Enough small mountain towns (w/pass tracks) along the way between the "southern" stage area and the "northern" stage area to offer some variety in "meet" locations, as well as adequate "local work".

* Some decent mineral-based industry such as a gravel plant, and maybe a lime plant.

* Provisions for smaller ("peckerwood") sawmills along the way and/or other small operations of some type.

Armed with the above, I used a 3/4" = 1' scale and began trying to see what I could do in regards to a mainline alignment that I could be happy with. IF I could accomplish that goal, then it would be time to migrate over to 1.5" = 1' scale, and start designing in sincerity. (Note: Won't do you any good to suggest a track planning software. I've tried some, and I MUCH prefer the tactile experience of designing on paper with a pencil, compass, templates, etc.)

The idea is: See if I can come up with "Definite Maybe" Ozark Sub layout I could enjoy for the long term. IF I'm successful at doing so, then next would be to push the plan aside for a "test of time, and in the meantime return to the track plan for my KC Lines concept and finish it up.

When a KC Lines track plan reaches the "Definite Maybe" status, I will then take the two track plans and compare the pros/cons of each before I make a final decision. I think I will find:

* The "KC Lines" layout will likely offer more pure "operation" in regards to yard switching and industrial switching, etc. It will also offer the ability to see all kinds of different railroads represented thereon because of the fact there was something like 13 Class 1 RR's in KC back in the early-mid 60s. Bottom line: It is a great concept and would translate into a fun layout. The track work needed for a KC Lines theme would take a bit longer to lay because of the complexity of the design. Typical motive power for operating sessions will comprise heavily of switcher-type locomotives.

* The "Ozark Sub" layout would get me back to my mountain railroading, and in so doing would offer helpers, local work (freights), "turns", small town settings (that I also like) and through traffic on a single track main through the mountains. The fact that it's mountain railroading also brings in the "drama" of same that can be capitalized upon. (Note: Mountain railroading has been my "home" in model railroading since about 1974.) The bench work needed for an "Ozark Sub" theme will be more involved than the bench work for a KC Lines theme, but I suspect it will consume notably less switches than the KC Lines theme. Typical motive power for an Ozark Sub theme would be road and road switcher units. Not much demand for a switcher-type engine, or engines.

So there you have it! This is where I'm at at the moment. Soon to come will be a tentative "Definite Maybe" track plan for the Ozark Sub.

Andre

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×