Skip to main content

Reply to "Theoretical Electrical Questions: Do more feed wires means less heat?"

I agree with Rich, but would go further.  18-gauge wire has to place on an O-gauge layout track feeder circuits.

Mannyrock.  For toggle-switching blocks, run the power from transformer to a control panel via 14-gauge.  On the panel place togglew switches for each block.  Run 14 gauge from toggle switches to each block.  For common, run a 12-gauge buss all around the layout, back to (and connected to) its point of origin.

Breaking up the ENTIRE layout into blocks provided a better degree of control when running conventional.  Years after I built my current layout, I plopped in DCS and made few wiring changes.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×