Skip to main content

Reply to "Thoughts on traditional track options/AF display progress"

Hi Aflyer,

A soak in diluted dishwashing detergent followed by a brushing is exactly what I did.

We are on the same wavelength in another area too - I've been giving more thought to putting down the track and just the other day decided on using dabs of Alex DAP - I always have some on hand. I figured that hotglue would dry too fast for track positioning, double sided tape would hinder slight adjustments too. Staples would be hard to use in some areas of my project.

I should be up to track laying in around a week, a lot of base prep work was needed after removing the old Lionel tracks. I think that tonight I'll work on making the two tunnel portals that I'll need. They will need to be in place before I position track.

Thanks for sharing the layout pics!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×