Skip to main content

Reply to "PROGRESS UPDATE 4,000 SQFT LAYOUT"

Originally Posted by L.I.TRAIN:

Not shown in the diagram and slated for the near future will be a logging line and a ceiling line encircling the entire train room.

 

Given the size of the layout room, are there any plans to have the ceiling line connected to the main layout?

 

While I imagine such a thing would not be accessed frequently, but it might be invaluable to be able to swap trains on such a loop without having to physically carry them up to and down from it.

 

I'm assuming that vertical clearances are planned to accommodate modern equipment such as double-stacks. I know the NJ Hirailers have places where unmodified stacks cannot go, although I think that's due to parts of their overall setup containing pre-existing layouts than any design flaws.

 

---PCJ

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×