Skip to main content

Reply to "TMCC only goes full speed"

Looking at the pictures again. I noticed a Phillips head in the second picture. Seemed odd. Looking at the 3rd picture it looks like it was put there to raise the board up a bit. Not ever seeing a 3rd rail factory installation I can’t imagine it would look like this.
In the TMCC part of the Forum. There should be a permanent post with pdf documents of instruction manuals that will show the correct install.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×