Skip to main content

Reply to "Track 'accuator' for signal"

johnstrains posted:

Agreed. I have a PW-style layout where I've tried to be true to the period (1950s) but I ditched those pressure contactors years ago. Really sort of a pain.

I use insulated track sections and in the case of the block signal a relay which really ensures smooth operation. 

Don't feel bad - you are not deviating from the time period - Lionel has patents for the insulated rail going back to the early 20's.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×