Skip to main content

Reply to "Track Design for Lionel Coaling Tower"

Jetguy posted:
Trainlover9943 posted:
Thanks. This part of the thread though is a little unclear. Should I go regular 072 switch or a wye switch? 

All depends on your layout and goals. More of an alignment thing than anything. Y then places both tracks on either side of the source track. A curved switch places one siding inline with the source track. Your choice.

Think I'm going to go with the Wye switch. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×