Hmm thats a good idea for lift bridges., maybe the Alt L is better than and just add some idustry stuff with spurs. I think on both layouts im going with coal and logging stuff. Maybe some others not sure lol. I do plan to add some coupling/uncloupling tracks that also have the operating track built in for dumping coal/logs its the gargraves pieces that have that option i think is the only way i can get that feature. Can you tell me what the two green tracks do there is 2 entries into the turn table does that allow turning around, maybe im just not seeing it or realizing the advantage to that just curious what the idea on that was.
|