That yard down below the main deck may pose a problem. You will need 7" plus your benchwork thickness minimum, and at least 12" if you expect to rerail a train. In order to do that, you are going to have a very steep grade of 8% or more.
As Ace points out, the first two dimensions look fine, but the third (vertical) is off.