Skip to main content

Reply to "Track Plan V1 - Little help from OGR Members"

Team,

On business travel for the next few days. I will try to run through all these comments tonight. A few stick out  - agree the bridge needs to move, did not think of that as I though more folks would look in from the TT.  Second, the lower level was not just for storage but to run so I technically thinking 3 mains so that need to be re considered. However, this feedback is great. I would rather have track layout exerts provide input before I build anything. The only items I am absolutely wedded too is the Millhouse River 28 in TT that I have along with my Altoona Model Round House. They have to stay but I am willing to start the redesign based on comments, suggestions and the picture.

Can't use RR-Tracks on the company CPU so I am limited.

I like this discussion.

Kevin 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×