Skip to main content

Reply to "Track Plan V1 - Little help from OGR Members"

George,

I have a Mill House River TT that I bought at York last year - 28 inch. My bad I should have gone 30 because the Lionel Vision Line BB can on be used over the bridge onto a straight. the RH is coming from Altoona Model Works and will have an extended bay so the BB will go over the bridge directly into the RH. 

The dog bone was an idea I have seen on the forum multiple times but given the comment I am going to have to do a redesign specifically because all the great folks on the forum made great productive comments on the grade, the bridge location (from Silk City Bridges - NJ HiRailers), the lower storage access and of course the need for access. 

So, I looked at a few posts last night, Alex has a new one, and a few others, I am going to see how I can modify, with the help of the forum members, the layout I planned - not wedded to it, and see where we can create the double track, then maybe a second level that fit in where you block the RH and TT view due to the bridge. 

So we are still learning and taking all the input from DoubleDaz and team,

Kevin 

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×