I finally was able to get some work done on the layout. I got all the benchwork bolted together and a solid tabletop on. On the left side I placed the transfer table. There I will have a engine yard, then transfer table and service facility. I posted a picture of the layout. The blue track represents the upper level and the green the lower. 

Next phase will be the slot car track so that I can space it out. Then foam for the lower level.