Skip to main content

Reply to "Train Room 04/18/2022 update"

Good morning everyone, I thought I would give a little update before Christmas. It has been a slow haul but I am still moving forward with a couple back steps here and there, but its all good! As you all can see I got the road bed laid for my outer loop. and was able to get some track down.20181207_14443520181207_14444120181209_152131

As you can see in the pictures below I redesigned my airfield to 1 1/2" foam with a plywood base for it. I realized after removing the foam that was there a few times to get access to the track it was a PIA, this is much better as I can reach in from the center if I have any problems. I also took the idea given to me from Paul2 and moved the runway over the tracks on the front and will add tunnels. Gives it some excitement!

20181211_09494620181214_09360320181214_093612

Last but not least I was able to get my first switch installed and part of the upper loop laid. Mr. Fedx came yesterday with another switch, so I hope to get that in today and finish the upper loop. I also was able to put power to the track I have laid and run a small train up and down the 25' of track I have up so far! Here is a Train Room tour video. I had to cut it in half to fit on the forum. Enjoy!

I hope you all have a wonderful Christmas and a great New Year!

 

Attachments

Images (10)
  • 20181207_144435
  • 20181207_144441
  • 20181209_152131
  • 20181211_094946
  • 20181211_094952
  • 20181214_093603
  • 20181214_093612
  • 20181211_094946
  • 20181214_093603
  • 20181214_093612
Videos (2)
Train Room# 1
Train Room# 2

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×