Good morning everyone, I thought I would give a little update before Christmas. It has been a slow haul but I am still moving forward with a couple back steps here and there, but its all good! As you all can see I got the road bed laid for my outer loop. and was able to get some track down.
As you can see in the pictures below I redesigned my airfield to 1 1/2" foam with a plywood base for it. I realized after removing the foam that was there a few times to get access to the track it was a PIA, this is much better as I can reach in from the center if I have any problems. I also took the idea given to me from Paul2 and moved the runway over the tracks on the front and will add tunnels. Gives it some excitement!
Last but not least I was able to get my first switch installed and part of the upper loop laid. Mr. Fedx came yesterday with another switch, so I hope to get that in today and finish the upper loop. I also was able to put power to the track I have laid and run a small train up and down the 25' of track I have up so far! Here is a Train Room tour video. I had to cut it in half to fit on the forum. Enjoy!
I hope you all have a wonderful Christmas and a great New Year!