Originally Posted by gunrunnerjohn:
In considerable detail, have you read the threads and the article?
The train starts its climb, at 1" per foot, with a lap of Lionel FasTrack 084" curve track followed by 072", 060", 048" then to 036" as it curves within itself to start its decent which contain all 036" at about 1" per 9.5". Around the top, at 7' above, is a single 031" circle for a trolley or something.
From this thread. Here it is, "THE" Christmas Tree Layout - Video Added
Sorry that I didn't make myself more clear. What I was looking for something more specific than generic numbers. Such as, a list of track needed, plans for the roadbed curves, etc.