note: I received a bit more space allocation to add a third 8’x3’ yard area and allow a raised 6’ long bridge to be part of the elevated trestle, mountain elevated 054 line. Just a rough draft again, I changed the layout design in the previous post above.
Progress with the move. Powered Units all moved a few weeks ago. All the in the box rolling stock (mix of new and run) were moved this week, all that is left is about 80 more cars that need to be dusted and cleaned and moved, removal of the display shelves in the old basement, then the track and switch removal can begin. Goal is to get everything out of the old basement to the new before thanksgiving. Pic of the rolling stock load in the new basement, this is near where one of the 12’x8’ loop areas will be placed.