Skip to main content

Reply to "21 Nov UPDATE: TrinkleTrains 5 Bay Ortners on Test Train in Colorado!"

Roo posted:

I liked the pipe train in the videos. great stuff. Roo.

Roo,

Those are plastic tubes cut to length, painted, wrapped with twine and simulated clamps added.  I hold the loads down with 3M putty.  Cars are Atlas O straight outta the box. Not hard at all.

Rick

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×