Skip to main content

Reply to "TUNNEL TUESDAY!"

TedW posted:
briansilvermustang posted:

some very nice pictures Ted, layout is looking great !!!

Thx, B, just paddling to keep up.  This xmas layout is winding down.  Need to decide whether to make the “big” jump n get off the ground.  Here’s where I am today...  

C531B7C4-C8A3-4819-B52D-0180DB464415

I say,  make the “big” jump Ted !!!  another great layout in the making.....

                               what do you think of this idea......

  make it a folded dog bone type, you would be able to use the same radii on both return loops, would end up being less than a 2% grade between levels, a mountain background along the wall and behind the town area on the upper level.  you could make a nice deep canyon swing out bridge for access into the layout.....two trains would run nice spaced out from each other for some nice meets on the double main line, with the return loops some what hidden in the tunnels... time to get busy...

Attachments

Images (1)
  • mceclip0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×