Skip to main content

Reply to "Turnout question-072 or #5"

That is exactly the feedback I needed--particularly about #4 switches being better switches in a yard-- and the fact that backing through #4's is better than 064's. I also had not thought about using larger radius curves as transition curves. I think the parallel trackage will look much better. The three tracks inside the right most return loop are for an engine service facility. Would you say that those should be #4's as well-- instead of 072's like I have now?

 

I really appreciate all the help.

 

The $100 bucks I spent for the RR-Track program is probably the best money I have ever spent. How you would draw all this up, and keep making changes using paper would be tough.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×