Skip to main content

Reply to "Twin Pines RailRoad"

Jeff- I went back after your comments and redesigned the yard lead to the outside of the main level loop. It gives me about a 17' run to the yard lead switch and a little less to clear the board above for the inner loop. Still steep but better than before. I actually realigned the yard tracks with a pair of 3-way switches and lengthened them in the process too.

Disregard the two random tunnel portals on the yard loop....SCARM is being flaky.

Test Plan 1.0.1_hidden yard

Here's the inner loop layer turned on to show the crossing point of the yard lead. Might be a good place for a bridge.

Test Plan 1.0

Bob

Attachments

Images (2)
  • Test Plan 1.0.1_hidden yard
  • Test Plan 1.0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×