Skip to main content

Reply to "Two trains running on same track & accessory wiring"

That was the reason I went to command operation over conventional.  With command operation you may run multiple trains on a single track and adjust speed, stopping etc. with handheld devices and worry about relays and mechanically controlling trains.  I switched from my 10 conventional engines in 2006 to running 70 command engines with 37 trains running simultaneously during one operating session.  I had multiple helpers with each one assigned to a loop with 2 to 4 trains and a handheld for each loop.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×