Skip to main content

Reply to "Update 1953 Showroom Layout with Fastrack"

Working out a couple of ideas:  1) have the On30 do something useful:  industries off of the oval generate ore and timber, which cross over the O mains to the other end of the layout, and are transloaded to the 3R O-gauge.   The O-gauge at that end of the line, has a mine.   

2) re-align the staging at the bottom, partially hidden, a connection to another RR and an interchange track.

M614_1953-Showroom_Layout_V8a

Attachments

Images (1)
  • M614_1953-Showroom_Layout_V8a
Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×