Skip to main content

Reply to "10/6/18 Layout Update, Search light signals working and CTC Signal System Complete"

I finally have an update to post on my layout.  I completed my dam for my river.   When I was designing it, I was not thinking about how much water it would control but more of the general look.  After looking at tons of pictures to model it after, I gave up and sketched my own design to build off of.  I was excited to get started, only after it was built, did I realize that it can only regulate a bit more than a foot of water.  The time a little project like this seems to take always seems more than it should.

 

The weathering leaves something to be desired, I tried dry brushing it.  While it looks better than no weathering, I could be so much better.  If any one had any recommendations for books on air brushing, I would like to read them.

 

Just now drawing my own plans for my icing station that will service 6 cars from between two tracks.  I have been struggling on finding pictures to help me with this also.  I would love to see any ones pictures to get some other ideas.    

 

Mike

 

 

 

 

 

IMG_2916

IMG_2919

IMG_2922

IMG_2914

photo[4)

Attachments

Images (5)
  • IMG_2916
  • IMG_2919
  • IMG_2922
  • IMG_2914
  • photo(4)
Last edited by Hump Yard Mike

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×