Skip to main content

Reply to "10/6/18 Layout Update, Search light signals working and CTC Signal System Complete"

I have not put any pictures up recently.  The layout is starting to look pretty respectable.  

 

I started with the RR track plan below (24' x 15') back in Dec '10 and completed most of the bench work with tracks and switches wired (DCS and TMCC) by the end of Feb '11 ( also completed most of the scenery on the mountain).

 

The summer of '11 came with nothing else started until Dec'11, when I installed my trestle.  Since then, I have put the remainder of my river in, created more pink snow around the entire house (from pink foam shaping), put down most of the ballast with a dirty wash, along with a skirt attached.

 

I think I have a little over 80% of my scenery roughed.  

 

I used Patrick H's method of carving the foam and Dennis B. fake water approach (painted shower door glass) on the large part of the river.

 

Shown below are many of the various stages in the layouts construction to present day.

 

Mike

MikeLeeLyout

IMG_2262

IMG_2275

IMG_2284

IMG_2297

IMG_2317

IMG_2320

photo [30)

IMG_2622

IMG_2627

photo [45)

photo [57)

photo [54)

photo [52)

photo [34)

photo [40)

IMG_2663

IMG_2667

IMG_2751

IMG_2748

IMG_2753

IMG_2754

IMG_2755

IMG_2756

IMG_2757

IMG_2764

IMG_2762

Attachments

Images (27)
  • MikeLeeLyout
  • IMG_2262
  • IMG_2275
  • IMG_2284
  • IMG_2297
  • IMG_2317
  • IMG_2320
  • photo (30)
  • IMG_2622
  • IMG_2627
  • photo (45)
  • photo (57)
  • photo (54)
  • photo (52)
  • photo (34)
  • photo (40)
  • IMG_2663
  • IMG_2667
  • IMG_2751
  • IMG_2748
  • IMG_2753
  • IMG_2754
  • IMG_2755
  • IMG_2756
  • IMG_2757
  • IMG_2764
  • IMG_2762

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×