Skip to main content

Reply to "10/6/18 Layout Update, Search light signals working and CTC Signal System Complete"

Yup I used Ross turn outs .  I should have learned my lesson on my first layout in struggles of certain engines having electrical problems over curved turn outs.   I learned the hard way that two of my articulated engines (lionel alleghaney and mth cab forward ) cannot make it physically through the o72/o96 turn out (the o72 route, it seems just add tadd too tight, I am not sure if it is what lionel would call o72).  Not enough room on the layout to correct with a different switch.  Try to avoid curved turn outs.

Last edited by Hump Yard Mike

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×