Well it's been awhile since the last post. I also rebuilt 2/3rds of my layout. Starting to see some light at the end of the tunnel. I completely tore out all my electrical except for my switch machines. Tore up and replaced my 3 rail to 2 rail. Replaced scenery and buildings. Decided to use Dwarvin fiber optic lighting. I really like it, simple and fast . After getting things back to order ran trains to make sure track and switches we r e working. Had to work on 2 switch machines and replace a small section of track that I was not happy with. I will add some pictures .
|