@CA John posted:I’m weighing three options for an independent upper loop; a small 027 oval, a trolly line, or an On30 logging or mining train. I’m leaning towards the On30 line because it will allow more visual interest in a smaller footprint. Problem is I have zero track and equipment in that scale. But that’s OK, I have enough work to do on the first level in order to even have a second level.
John
Just the fact that I already have a boatload of O27 has been the main reason I have considered a trolley track. I would just need to get a trolley, and the shop I frequent always seems to have a few around.
Thanks for replying!