Skip to main content

Reply to "VISION Big Boy Help!"

OK, I got some pics of the work area to contend with and with the blow down tube disconnected; I have ordered the caps.  I am thinking that the white plug at the front of the motor that goes into a board that has 4 soldered nubs on the forward side of the board is where I will have to solder the cap??

Big Boy with boiler resting on cradle

 

Boiler front as close as possible.

Attachments

Images (4)
  • Big Boy with top resting on top of cradle.
  • Side view of motor without cap and white plug going into a board,
  • Front view of motor where there ar 4 solder nubs at the white plug.: Front view of motor where there ar 4 solder nubs at the white plug.
  • Boiler front as close as possible.: Boiler front as close as possible.
Last edited by RickM46

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×