Skip to main content

Reply to "VJandP - Getting Started"

@SteveH posted:

Vin, I empathize with your power issues.  Been there done that with FasTrack.  My first two recommendations would be to wire the switches directly with Aux Power and Ground.  The Second, sounds like you're already thinking this, add track feeders (hot and common) every 6-10 track pieces.

If you post on the electrical forum, I would suggest including your latest SCARM plan.

Using a separate power source for the switches or just wiring them direct off the track power bus? Not an issue for me at the moment but thinking about the future when a dozen switches are in play.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×