@GregK posted:Using a separate power source for the switches or just wiring them direct off the track power bus? Not an issue for me at the moment but thinking about the future when a dozen switches are in play.
@GregK Like you, I was fine while there were only 5 turnouts. Now I have 13 and things are getting a bit wonky. Power delivery isn’t consistent. It’s not just the turnouts, the overall performance of the layout decreased dramatically as I expanded it.