Skip to main content

Reply to "Working on my layout."

Started working on the polar express part of the layout. It will have its own dedicated loop.  It doesnt like the 072 switches at all. On the plus side the kids can run it and i dont have to worry about it going wrong.  It will go over the top of the mainline and do another loop on the right side. My friend Chris and I are going to build a big mountain to have a double tunnel for the mains and then a tunnel on the back track for the polar express. The front track will have a trestle of some sort. 62ECC7D5-EE20-4AAA-AECF-9185EDC3F0E1DE2FFADE-164D-4AC2-9FF6-1729E28755FC

Attachments

Images (2)
  • 62ECC7D5-EE20-4AAA-AECF-9185EDC3F0E1
  • DE2FFADE-164D-4AC2-9FF6-1729E28755FC

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×