Skip to main content

Reply to "Working on my layout."

Dewey Trogdon posted:

Rough-in wiring for wall receptacles and switched overhead lighting before installing insulation. Heat/cooling ducts? Paint ceiling and rafter slope sky blue post drywall. Then build round the wall like Jan shows in Scarm. Rough wire the benchwork framing before you cover up to reduce "trainback/train neck" working time under the layout. Since you are planning Command Control if desirable your power center can be located on the wall under the layout. To avoid an entry duckunder you can follow advice above and use a lift out, a lift up bridge or a hinged drop down as pictured below. Jim Barrett shows "how to" for up or down in OGR video #11. 

IMG_1582

IMG_1580100_1248

 

 

Dewey, great looking train room! Nice work!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×