Skip to main content

Reply to "WEEKEND PHOTO FUN 1-23-15-??"

My train room addition and its ceiling layout shelf are almost finished (contractor and subs leave for good).

The diagram shows the basic main line loop around the ceiling, passing siding (left), bridge route (upper right), and future train elevator (now removable stub siding).

 

A01 templated plan

A02 template bridge photo

A05 bridge shelf finished

A08 east bridge support finished

A10 west bridge support finished

A11 west brdige support steel

A13 removable stub siding door main speakers

A16 removable stub siding aluminum

A18 removable stub siding floor croped

Attachments

Images (9)
  • A01 templated plan: Portions of the track plan that (curved) for which templates were created
  • A02 template bridge photo: templates and track on subfloor with 1:48 scale picture of Rock Island, Wa bridge suppended in position
  • A05 bridge shelf finished: finished shelf with poll standing in for bridge (yellow tube to yellow tube)
  • A08 east bridge support finished: finished East "shore" bridge support
  • A10 west bridge support finished: finish West "shore" (on the south wall) bridge support
  • A11 west brdige support steel: steel frame of East bridge support
  • A13 removable stub siding door main speakers: Removable stub siding with door and main surrond sound speakers in background
  • A16 removable stub siding aluminum: Removable stub siding from shelf top
  • A18 removable stub siding floor croped: Removable siding and finished floor
Last edited by klazys

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×