Skip to main content

Reply to "Weekend Photo Fun 10-14-21-??"

Planning for 2021 Christmas Layout Memories

I've settled on a design and a scenery configuration.  Building starts mid-November.

I still prefer pencil and paper over software.  My paper is a grid where each block represents 2'x2'.

Lower Level track and scenery plan ( the red rectangle lower left will be a 4'x7' elevated plateau.  In my drawings dotted lines are ramps.

Lower Level

Plateau:

Plateau

I plan out everything.  This image shows lockon positions (the red circles) and placement of dummy pins for track "separation":

Lockons

I also plan out what elements will be connected to each of my 2 AIUs, including how I will name them in the remote:

AIUs

And finally, I also plan out how I will layout the Homasote pieces.  I put down same-sized blue board first and run wires in the gaps that I leave between then.  Then I cover that with the Homasote:

Homasote

My goals were very, very simple and basic for 2021:

1. Have the lower tin-plate trackage reverse direction

2. Have a smaller than usual 4'x7' plateau

3. Use the MTH bridge

4. Use my 10' long ramp.

5. Plan on 2 AIUs

I absolutely LOVE the planning stage, more, I think, than building and running.

- walt

Attachments

Images (5)
  • Lower Level
  • Plateau
  • Lockons
  • AIUs
  • Homasote
Last edited by walt rapp

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×