Worked on Brewery front some more tonight. I cut out the two loading dock doors and made false interior spaces and painted them tonight. I am going to reuse the one wooden loading dock door in the interior back wall of the dock. The other dock interior will probably get a photo applied to to it (like bottling floor of brewery) I will be installing micro warm light LED chips in the ceilings of these two dock insides so that you can see the interior space. I also got these awesome 3D printed bottles with the old fashioned wood cases and also some beer kegs which haven't arrived yet. I paint the cases wood tonight and will be applying translucent brown paint to the bottles. I will be starting painting tomorrow after making and attaching mounting brackets to hold the light box on the back of the front.
I also worked on repainting a Twin Whistle engine house and will be installing a couple lights in the interior and I want to add to red lights to the front. Thinking of 3D printing a lamp base and use a LED inside of a red bead
And last night I worked on painting two fronts from DSL shops. The bank and Goldblatt's fronts. I'm not done painting the Glodblatt's front yet. This is also going to be a Woolworth's and Dave from Crescent Locomotive works is working on this sign along with a few others, like the brewery sign.
The Red sign is really going to pop with the gold letters and black diamonds