Skip to main content

Reply to "What did you do on your layout today?"

The heatwave took a break today.  I worked in the train building all day.  I removed four 1122 switches and installed six O22 switches.   Two new spurs popped up.  When I pulled the track, I vacuumed in the tough spaces.  I have not wired the switches yet but I tested them all before giving them a home.  I also began the change to O31 track.  I found 42 pieces cheap on the bay.  It will be cool again tomorrow.  Sounds like a good time to pull wires.  Early to bed tonight.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×