Evening Y'all,
I'm in the big house taking a break. My goal today was (is) to run permanent power to the train building. I ran on an extension cord way too long. I pulled 10/3 from our main power panel to a small breaker panel in the train room. I have two 15 Amp circuits. One for everything train and one for lights and heat. I will install a small air conditioner over the winter when they cost less. I have a deal brewing that will nearly double my fleet. I'm thinking of running two tracks up high along three walls for storage. I have lots of wood. Now I need a good plan. I'm grateful for the cooler weather. I promised the CFO that I would invest time in something other than trains tomorrow. I will post an update tonight when I finish or give out.
Bill