Skip to main content

Reply to "What did you do on your layout today?"

Made some pretty good progress on the lift gate in the past 2 days...  It's late, I'll be more chatty tomorrow.  Sorry for the mess in the photos....  Just one of those non-stop construction days with stuff building up everywhere....   This is the last wide radius curve with the lift gate and the main line will be continuous, connecting the upper level and lower level into one long single track main line.   Pretty motivated to get trains running non-stop by the end of this weekend. 

DSC03772DSC03773DSC03771DSC03767DSC03766

 

Attachments

Images (5)
  • DSC03772
  • DSC03773
  • DSC03771
  • DSC03767
  • DSC03766

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×