Skip to main content

Reply to "What did you do on your layout today?"

Well guys, I went out with the idea of putting concrete between the tracks in my Service House. I cut the wood to put in there, primed it 4 times, sanded it 3 times, clued it down. Then had to go back and sand the sides some more so the 3 rail wheels wouldn't ride up on it!

But what took me so long was I was under the table looking for something and found a BNSF swoosh caboose. I knew it had to be hooked up, but first I had to put Kadee's on the last car of the train.

Which brings up another long drawn out project, putting the little springs back into the side frames! Can someone tell me what the trick to that is?

Here are a couple photos!

IMG_20191202_140308660IMG_20191202_140317208IMG_20191202_140332046_HDRIMG_20191202_145106141IMG_20191202_145111622_TOPIMG_20191202_145937368

Matt and Jon, your electrical work looks great! 

Paul 2, The river bed is coming right along! What color are you going to paint the bottom of the river?

I hope everyone had a great day and found time for there trains and layouts!

Attachments

Images (6)
  • IMG_20191202_140308660
  • IMG_20191202_140317208
  • IMG_20191202_140332046_HDR
  • IMG_20191202_145106141
  • IMG_20191202_145111622_TOP
  • IMG_20191202_145937368

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×