Skip to main content

Reply to "What did you do on your layout today?"

Hi Guys 

Just to bring you up to date on the Waxhaw division in NC, the track work on the upper levels has now been completed. I still have some work to do with the railking bridge piers to set those and attache permanently. In a month Next step will be to do the wiring for track power and run a train into those spurs.

Now we are working with the Northport division. We  a Union station that ties the upper and lower levels together. I wanted to add some railings along the upper level to cap the wall. Rix sells a 1930s style concrete  highway railing but it is HO scale. Thinking of raising it  up a bit on a strip of wood or foam to simulate a bass and put the railings atop that . Couple of photos showing the planning. Think this will wok out. Will paint the rails in aged concrete . Think it will look nice here.

IMG_4828

 

IMG_4830 

Attachments

Images (2)
  • IMG_4828
  • IMG_4830

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×