Hi Guys
Just to bring you up to date on the Waxhaw division in NC, the track work on the upper levels has now been completed. I still have some work to do with the railking bridge piers to set those and attache permanently. In a month Next step will be to do the wiring for track power and run a train into those spurs.
Now we are working with the Northport division. We a Union station that ties the upper and lower levels together. I wanted to add some railings along the upper level to cap the wall. Rix sells a 1930s style concrete highway railing but it is HO scale. Thinking of raising it up a bit on a strip of wood or foam to simulate a bass and put the railings atop that . Couple of photos showing the planning. Think this will wok out. Will paint the rails in aged concrete . Think it will look nice here.