Skip to main content

Reply to "What did you do on your layout today?"

Worked on the korber building flat. Got the sidewalls glued on along with the wood bracing. Placed for the time being where it will be positioned. The open space above it will be filled with another building flat I have plus I ned to get more PVC pipe to make up more silos. Still have to put in all the windows and paint the loading doors or maybe I'll leave them the color they are, put on the roof, and the loading dock. There is always tomorrow. Suppose to be a rain day ( I hope ). Pics.............Paul 2

DSCN0238DSCN0240DSCN0239DSCN0241

 

Attachments

Images (4)
  • DSCN0238
  • DSCN0240
  • DSCN0239
  • DSCN0241

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×