Skip to main content

Reply to "What did you do on your layout today?"

A few weekends back I bought a 1/2 sheet of 1/2" plywood to create an equipment shelf for beneath the layout and cut it to size - 26 1/2 x 17.  I made it large enough to hold a TIU, AIU, PowerHouse 180 brick and TMCC command base - with some room to spare.  

On Sunday I got the shelf installed and yesterday I got the TIU, AIU and PowerHouse set up:

IMG_0864 [1) 

IMG_0867 [1)

I was running with an MTH Z-1000 - the PowerHouse upgrade should provide a bit more power.  I also moved all the track wiring to a proper star wiring configuration, got three power drops in for a previously unpowered siding and phased all the power sources.

IMG_0866 [1)

I have a bit more to do around wiring management, but definitely made good progress on getting the power reworked and the TIU off of a box on the floor. 

Attachments

Images (3)
  • IMG_0864 (1)
  • IMG_0867 (1)
  • IMG_0866 (1)
Last edited by Luther Stanton

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×