CGWforever posted:Just finished the project of die cast girder bridge for double main line. Bought pair of NYC girder bridges from auction site at very cheap price. Removed one side girder from each bridge into one wide bridge. Used middle metal plate from old Lionel girder bridge to fill the gap in middle. Sanded lightly to remove the prints, installed plastic plate on one side of girder for C&NW logo. Painted all. After paint dried, applied C&NW logo on the plastic plate. Used aluminum duct tapes under the bridge to hold together, painted it, installed under tracks. All done!
Neat project that came out great GCWforever. It really updated the PW style bridge