Skip to main content

Reply to "What did you do on your layout today?"

I spent a long time planning my layout. I realy got into the layout construction phase after winter settled in here inNorthernNew YorkState (and after my wife threatened to use my train room for quilting if I didn't get moving!) My lower level basically consists of a folded dogbone with the right side containing a five track yard and a ladder track, and the left loop containing a reversing loop. I have plans for the upperlevel, but that part of the project is a long way off. I used Gargrave track and Ross switches. I installed Gargrave uncoupler tracks on all the yard tracks, and also on a siding coming off the reversing loop on the left side. Included are some photos. I have spent the last several days (including today) on my knees under the tables running and connecting the wires for the electrical system. I am learning to do the electrical as I go.

EL BOB

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×