Skip to main content

Reply to "What did you do on your layout today?"

mike g. posted:

Morning guys, its been a few day and a lot had happened so here I go. Oh By the way I read Alan's psot so this is all train related!

 

Lew, I plan on using the same system, but have to make it smaller as it now will be right above my Z4000 and wiring from my control panel. That will be one of my next projects along with getting the retaining wall along the back wall so I can ballast and be done back there so I can set building where I think I want them! As for the slot I am not sure if I will do that again, I might just ad some weight to the control wire so it will retract when the crane moves back and forth!

 

I hope everyone has a great Friday and a wonderful weekend! Oh and don't forget to find some time for your trains and layouts! If anything just go out and run your trains till your happy!

Mike, I think I see what you mean. You could attach a cable to the nut that is moved by the screw and with a pulley or two get from under the benchwork to above the deck and then it would look a lot like what I ended up with.

                        mikes motor

This whole assembly could be conveniently mounted under the benchwork with the operating cable attached to one of the tabs.

   20190602_142335

Attachments

Images (2)
  • mikes motor
  • 20190602_142335

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×